top of page

JASK BRIDGE

SUMMARY

West Bypass Railway Bridge (going and coming lanes) with 2 spans and a length of 31.5 m was designed and manufactured at the order of Simin Sepahan Company for the passage of a 300-ton train and it was erected in Esfahan within a period less than 18 hours in the form of a part of railway hotline

416 799 8801

156 St. Regis Cres. S.,

North York, Ontario

M3J 1Y8,

Canada

© 2022 by Geomaple Geatechnics Inc.

bottom of page